
23 July Road and Connection Roads Rehabilitation
Roads & Bridges · Libya
100.250 m²
Road area
2.428 m
Road length
27.070 ton
Asphalt
23 July Road and Connection Roads Rehabilitation
A road rehabilitation expanding the main artery to as many as 14 lanes in two phases, with new pedestrian and vehicle bridges.
SET is upgrading the connection roads and expanding the main artery to as many as 14 lanes in two phases, alongside new pedestrian and vehicle bridges.
Project Scope
Upgrading connection roads, expanding the main artery to up to 14 lanes in two phases, new pedestrian and vehicle bridges



